1 General ………………………………………………………………… (1)
2 Basic Requirements …………………………………………………… (2)
3 Construction Management …………………………………………… (3)
3. 1 General Requirements ……………………………………………… (3)
3. 2 Site Investigation …………………………………………………… (3)
3. 3 Design Review and Design Briefings ……………………………… (4)
3. 4 Construction Management Plan …………………………………… (4)
3. 5 Preparation for Construction and Conditions for Commencement … (5)
3. 6 Briefings on Construction Technology and Health? Safety and
Environment ………………………………………………………… (6)
3. 7 Trial Works ………………………………………………………… (7)
3. 8 Process Quality Control? Inspection and Acceptance of Concealed
Works ……………………………………………………………… (7)
3. 9 Construction Survey ………………………………………………… (8)
3. 10 Test and Measurement …………………………………………… (9)
3. 11 Work Reports and Records ……………………………………… (9)
3. 12 Inspection and Acceptance Upon Completion and Delivery ……… (9)
3. 13 Warranty of Construction Works ………………………………… (10)
4 Temporary Works …………………………………………………… (11)
5 General Works ………………………………………………………… (12)
5. 1 Earth Works ……………………………………………………… (12)
5. 2 Ground Improvement ……………………………………………… (14)
5. 3 Piling Works ……………………………………………………… (18)
5. 4 Concrete Works …………………………………………………… (19)
5. 5 Steel Structure Works …………………………………………… (23)
6 Port Waterfront Structures? Roads and Yard Areas ……………… (26)
6. 1 General Requirements …………………………………………… (26)
6. 2 Quays and Wharves ……………………………………………… (27)
6. 3 Breakwaters and Revetments ……………………………………… (33)
6. 4 Roads and Yards ………………………………………………… (35)
6. 5 Underground Structures and Galleries for Rail Car Unloading
Systems …………………………………………………………… (37)
1
Contents
7 Dredging and Reclamation Works ………………………………… (39)
7. 1 General Requirements …………………………………………… (39)
7. 2 Dredging Works …………………………………………………… (40)
7. 3 Reclamation Works ……………………………………………… (41)
8 Waterway Works ……………………………………………………… (43)
8. 1 Waterway Training Works ………………………………………… (43)
8. 2 Navigation Lock Works …………………………………………… (46)
8. 3 Navigational Aids ………………………………………………… (48)
9 Waterfront Structures in Shipyards ………………………………… (50)
9. 1 Dry Docks ………………………………………………………… (50)
9. 2 Shipbuilding Berths and Slipways ………………………………… (53)
10 Equipment Installation ……………………………………………… (55)
10. 1 General Requirements …………………………………………… (55)
10. 2 Port Equipment ………………………………………………… (55)
10. 3 Lock Gates? Valves and Headstock Gear ……………………… (58)
10. 4 Dock Gate and Pump House …………………………………… (60)
10. 5 Electrical and Control Equipment ……………………………… (60)
Appendix A Site Investigation Scope and Requirements for
Construction of Port and Waterway Works …………… (62)
Appendix B Descriptions and Requirements for Preparation of
the Construction Mangement Plan for Port and
Waterway Works ………………………………………… (66)
Appendix C Definitions of Some Words Used in These General
Rules ……………………………………………………… (70)
Additional Notes ………………………………………………………… (71)
Explanatory Notes to Clauses …………………………………………… (73)
2