CONTENTS
1General(1)
2Basic Requirements(2)
2.1Grade of Project, Classification of Structures and Design Working Life(2)
2.2Sizing of Port and Waterway Works(5)
2.3Safety(7)
2.4Conservation of Resources and Energy(9)
2.5Environmental Protection(10)
3Design Conditions(12)
3.1 Natural Conditions(12)
3.2Operation Requirements(14)
3.3External Conditions(15)
4General Layout(17)
4.1Port and Harbour Works(17)
4.2Waterway Works(20)
4.3Multipurpose Canalization Projects and Navigation Structures (22)
4.4Waterfront Structures for Shipyards(25)
4.5Dredging Works (26)
5Structural Design(29)
5.1General Requirements(29)
5.2Quays and Wharves(30)
5.3Navigation Structures(35)
5.4Waterfront Structures for Shipyards(36)
5.5Waterway Training Structures(39)
5.6Breakwaters and Revetments(42)
5.7Piled Foundations(43)
6Foundation Design(46)
6.1General Requirements(46)
6.2Ground Improvement(47)
6.3Foundation Design(49)
6.4Monitoring and Examination(50)
Appendix AExplanation of Words and Expressions(51)
Additional NotesChief Editorial Organizations and Contributors List of
Members Participating in the Compilation and
Management Work(52)
Explanatory Notes to Clauses(55)